Weiland Road Improvements

The Lake County Division of Transportation identified the Weiland Road Improvements as one of the key projects needed to relieve congestion in this heavily traveled corridor of the County. The improvements include Weiland from north of Lake Cook Road (Woodstone Drive) to south of Deerfield Parkway and north of Deerfield Parkway to Aptakisic Road in Buffalo Grove, Illinois. This project involves reconstructing Weiland Road from an existing two-lane asphalt pavement to a five-lane asphalt pavement including two lanes in each direction with a center turn lane through a majority of the project.  The Weiland Road Improvements will increase highway user safety, improve capacity and operation, replace aging infrastructure, and enhance the regional roadway network.

South Section Overview:

Reconstructing Weiland Rd from an existing two-lane asphalt pavement to a five-lane asphalt pavement including two lanes in each direction with a center turn lane through a majority of the project.  Project improvements also include: construction of an asphalt bike path on west side of Weiland Rd., installation of a concrete sidewalk on east side of Weiland Rd., construction of detention pond on east side of Weiland Rd., replacement of existing culvert under Weiland Rd. at Aptakisic Creek, installation of street lighting, and installation of noise abatement wall on the west side of Weiland Rd. north of Newtown Dr.

North Section Overview:

Reconstructing Weiland Road from an existing two-lane asphalt pavement to a five-lane asphalt pavement providing two lanes in each direction, a center turn lane through a majority of the project, an 8’ multiuse path, 5’ sidewalk, and bicycle friendly shoulder configuration.

Location
Buffalo Grove, IL