Lakeshore Drive Drainage System Improvements

The Town of Lake Park contracted with Baxter & Woodman (Mathews Consulting) to provide engineering services for the design of drainage and other related improvements on Lakeshore Drive starting from the entrance of the Lake Park Marina north 3,220 feet
to Castlewood Drive. Lake Shore Drive is prone to frequent flooding with road elevations ranging from 2.0 to 3.2 feet, NAVD. A drainage system was designed to reduce flooding caused by storms and sea level rise by using a stormwater pumping station to pump water up to a dry bioswale that will overflow into the Intracoastal waterway.
Services include:

  • Survey
  • Drainage System Design
  • Pollution Control Device
  • Dry Detention in Park
  • Other Utilities
  • Roadway Design
  • Permitting
  • Public Outreach
  • Construction Services
Location:
Town of Lake Park, FL
Completed:
2019 (Design)
Highlights:
Roadway Improvements Stormwater Pumping Station Bike Path
Permitting
Utilities Coordination
Public Outreach